CONCRETE


Precision design for roadway enhancement

ODOT- North Marginal Road

Cuyahoga County

Project Description: Construction work consists of 2.66 miles of full depth concrete repairs.

ODOT- State Route 59 and Interstate 76

Summit County

Project Description:
Part 1: Improvement of 3.45 miles of SR 59 in Summit County by diamond grinding and planing of surface and placing asphalt layer. Various structures throughout the project will be improved as well. Partial and full depth repairs are to be included.
Part 2: Permanent closure of IR 76 entrance ramp from Wolf Ledges. Existing sidewalk will be continued to tie into existing structure, SUM-76-10.76.Existing catch basin and pipes will be removed. New curb inlet catch basin is to be constructed.

ODOT-Interstate 90

Ashtabula County

Project Description: Concrete Pavement for maintaining traffic.

ODOT-State Route 2

Cuyahoga County

Project Description: Concrete Pavement for maintaining traffic

ODOT-District 12 Highway Concrete Maintenance

Cuyahoga County

Project Description: This project consists of concrete pavement repairs and preventative maintenance to I-480 ramps at Ridge Rd. and SR 94; SR 176 ramps at I-480; I-77 ramps at Harvard Ave., I-490 ramp at I-77; I-90 median at the Inner belt Curve; SR 175 at Harvard Rd., I-90 shoulder east of SR 306; and I-90 ramps at SR 615.

Rockside Road

Cuyahoga County

Project Description: Full depth concrete repairs, Sidewalks, drive aprons and traffic signal upgrades for 2.9 miles of Rockside Road – CR 53 from Broadway Avenue in the City of Bedford to Aurora Road in the City of Bedford Heights.

Karvo Companies

4524 Hudson Drive
Stow, Ohio 44224
330.929.9616 Office
330.929.9620 Fax

Follow Us On Linkedin