ASPHALT


Improving highways throughout Ohio

ODOT- Smooth FY 2016

Crawford County, Richland County, Huron County

Project Description: This project consists of asphalt pavement repairs, placing 424 surface course and installation of pavement markings.

ODOT- Interstate 271

Cuyahoga County

Project Description: 4.36 miles of highway improvements on I-271 between the Fairmount Boulevard overpass to the Wilson mills exit.

ODOT-Interstate 77

Cuyahoga County

Project Description: Asphalt resurfacing of mainline IR 77 from Rockside Road to the IR77/IR490 Interchange.

ODOT-US 422

Cuyahoga County

Project Description: This project provides for the 4 lane resurfacing of mainline US-422 from SR-175 (Richmond Rd.) to Solon Rd. Work items include planing and resurfacing, full-depth pavement replacement near approach slabs, micro-silica overlay of approach slabs, top of backwall repairs, curb ramps at the ramp 4 and Harper Road intersection, and placement of pavement markings and raised pavement markers.

ODOT- Interstate 480

Cuyahoga County

Project Description: This project consists of the resurfacing of 1.99 miles of I-480N from I-480 to I-271 in Cuyahoga County.

ODOT -SR 224 and SR 534 Part 1 and 2

Job Description:
Part 1: Improvement of 5.43 miles of SR 224 and 8.56 miles on SR 534 by planing and resurfacing. Part of the improvement includes a section of single chip seal placement and various pavement repairs.
Part 2: Minor structure rehabilitation

ODOT -State Route 252

Medina County

Project Description:
Part 1: Resurfacing, including pavement planing, pavement repairs, drainage repairs, guardrail repair, traffic control items, and structure maintenance.
Part 2: This project includes the widening of SR 252 (Columbia Road) to three (3) lanes to accommodate a dedicated left turn lane at the proposed Buckeye Local Elementary School complex and the existing Southern High School Drive. Drainage improvements, as well as signing and pavement marking improvements, will be included.

ODOT-Interstate 71

Cuyahoga County

Project Description: This project consists of the resurfacing of 4.20 miles of IR-71 with asphalt concrete from SLM 5.72 to SLM 9.92 in the Cities of Brookpark and Middleburg Heights.

ODOT -US 30 and State Route 11

Columbiana County

Project Description: Improvement of 3.27 miles of US-30 and 0.23 miles of SR-11 in Madison Twp. of Columbiana County by milling and resurfacing the traveled roadway and shoulders. Project also includes new guardrail and pavement markings.